Job site prepared for drain field.
Tubing ready to be installed at 6 to 8 inches below surface.
Drain lines are to remain undisturbed; caution tape is placed around designed area.
 
Putting the unit to bed.
 
Formerly unbuildable lake lot.
 
Previous Page